OPERATIONS ROOM
PLANTIR · GARDEN PLAN · 2026 SEASON · ALL TIMES UTC
STANDBY PUBLIC EXPORTER PIPELINE — STANDBY (PLN-003).
Showing reference geometry seeded from operator records.
Showing reference geometry seeded from operator records.
6 PLANTINGS 2 GROWING 3 PLANNED 1 HARVESTING 1 FAILED
AS OF 2026-05-03 14:32:11Z
PLOT MAP · 4 ZONES · 1 GREENHOUSE
NOMINAL
PLAN-vs-ACTUAL · 2026 SEASON
DRIFT
TOMATO Z1 · S.MARZANO
+5d
CUCUMBER Z2 · M’MARKET
PEPPER · CAL.WONDER
CARROT · NANTES
RADISH · F.BREAKFAST
LETTUCE · BUTTERHEAD
+5d
INCIDENT LOG · LAST 30d
OUT-OF-SPEC
- #03 CUCUMBER ZONE D — OUT-OF-SPEC moisture, 18h continuous 2026-05-02 19:01Z → ongoing
- #02 SENSOR LIVENESS — node esp32-greenhouse-1 silent 4h12m 2026-04-29 02:14Z → 2026-04-29 06:26Z · resolved
- #01 HUB POWER LOSS — UPS battery exhausted, no escalation path 2026-04-23 22:31Z → 2026-04-27 18:00Z · resolved · 3d 19h
See /thesis/2026/incidents for the full log + post-mortems.